Before you set up your system environment, you must
verify that the prerequisite conditions for the system are met.
This information applies to the supported hardware components.
Answer the following questions before you start the installation process.
- Does your physical site
meet the environment requirements for your system?
- Do you have adequate rack space for your hardware?
The
system requires two Electronic Industries Alliance (EIA) units for each control enclosure or expansion
enclosure per enclosure.
- Do the power circuits that you are planning to use have sufficient
capacity and the correct sockets for your
installation?
- A clearly visible and accessible emergency
power off switch is required.
- For redundancy,
two independent power circuits are required. One circuit connects
to each power supply in each enclosure.
- Have you provided appropriate connectivity by preparing your environment?