If your Lenovo Storage V7000 system
has 8 Gbps Fibre Channel 4-port host interface adapters installed, you can use Fibre Channel cables to connect them
to your Fibre Channel SAN.
To install the cables, complete the following steps.
- Connect the required number of Fibre Channel cables.
Refer to Planning network cable connections for
instructions to determine the number of required cables.Note: Both canisters must have the same number of cables
connected.
Figure 1 shows an example configuration with two Fibre Channel cables
connected to each canister.
Figure 1. Example configuration with two Fibre Channel cables per canister
- If you want to connect additional Fibre Channel cables,
make sure to connect the same number of cables to each canister.
Figure 2 shows an example configuration with four Fibre Channel cables
connected to each canister.
Figure 2. Example configuration with four Fibre Channel cables per canister
- If
a control enclosure is already installed, you can optionally add Fibre
Channel connections between all the control enclosures.
- This involves both the physical installation of the cables and
configuring the correct zoning on the Fibre Channel switches.
- Configure the network so that every node canister has at least
two connections to every node canister in a different control enclosure.
- You must configure the network before you attempt to add a control
enclosure to an existing system.