You can migrate existing remote copy partnerships and relationships when you change
the type of connections between the two systems.
It is possible to migrate existing remote copy
relationships and partnerships from Fibre Channel to native IP, from native IP to Fibre Channel,
from IPv4 to IPv6 deployments, and from one Ethernet speed link to a different Ethernet speed
link.
Migrate the existing remote-copy relationships and partnerships from Fibre Channel to native
IP
Complete the following procedure:- If the two
systems are in Fibre
Channel partnerships on pre-7.2.0 code, update both
systems by using your
defined update schedule.
- If the two systems are in Fibre Channel partnerships,
and the control enclosures are using pre-7.2.0 code, update both systems by using your defined update schedule so all components in the two systems
are at the same code level.
- After both systems are on 7.2.0 or later code, complete
the following steps:
- Schedule a downtime and stop host I/O while relationships are still active.
Note: To ensure that
all cached data on the host is flushed to the volumes, make sure that any file systems that are
mounted on replicated Fibre Channel volumes are unmounted first. This process must be done for all
Fibre Channel relationships. It must be done on all hosts if the same volume is used by multiple
hosts (for example, using clustered file systems like VMFS). If you are using other applications,
you must ensure that you synchronize all cached data from application to disk. The procedure might
be application-specific as well. For example, Oracle, IBM Db2, and so on might need to be stopped, while for some applications you might need to run
synchronization on the host.
- If there are Global Mirror change volumes (remote-copy relationships), complete the following
steps. If not, go to the next step.
- Stop the relationship and change to noncycling Global Mirror.
- Start the relationship.
Note: Make sure the relationship changes to
consistent_synchronized (or else wait until the relationship's state is
consistent_synchronized).
- Stop the relationships without -access flag and verify that the status for each
relationship is in_sync.
- Delete the remote-copy relationships.
- After all remote-copy relationships are deleted, stop and delete the partnerships from both
systems.
- Remove/delete the zoning between the two sites so that the two systems are not listed as
available systems when you run lspartnershipcandidate.
- Configure the IP ports by using cfgportip and establish IP Partnerships.
Additionally, configure CHAP if required.
- Create the remote-copy relationships with the -sync flag for Metro Mirror,
Global Mirror, or Global Mirror change volumes with the original master and auxiliary volumes
(previously used in the Fibre Channel partnerships) on respective sites.
- Add the change volumes to the respective relationships.
- Start the remote-copy relationships.
This completes the migration of remote-copy relationships from Fibre Channel to native IP.
Migrate the existing remote-copy relationships and partnerships from native IP to Fibre
Channel
This procedure applies to two
systems that are in IP
partnership on 7.2.0 or later code.
Complete the following procedure:
- Schedule a downtime and stop host I/O while relationships are still active.
Note: Ensure that any
file systems that are mounted on replicated Fibre Channel volumes are unmounted first so that all
cached data on the host is flushed to the volumes. This must be done for all Fibre Channel
relationships. It must be done on all hosts if the same volume is used by multiple hosts (example:
using clustered file systems like VMFS). If you are using other applications, you must ensure that
you sync all cached data from application to disk. The procedure might be application-specific as
well. For example, Oracle, Db2, and so on might need to be
stopped, while for some applications, you might need to run synchronization on the host.
- If there are Global Mirror change volumes (remote-copy relationships), complete the
following steps. If not, go to the next step.
- Stop the relationship and change to noncycling Global Mirror.
- Start the relationship.
Note: Make sure the relationship changes to
consistent_synchronized (or else wait until the relationship's state is
consistent_synchronized).
- Stop the relationships without the -access flag and verify that the status for
each relationship is in_sync.
- Delete the remote-copy relationships.
- After all remote-copy relationships are deleted, stop and delete the partnerships from both
systems.
- Unconfigure the ports in the remote copy port groups (set them to 0) on both systems.
- Create the zones between the two sites so that the two systems are listed as available systems
when you run lspartnershipcandidate and lsfabric.
- Create the remote-copy relationships with the -sync flag for Metro Mirror,
Global Mirror, or Global Mirror change volumes with the original master and auxiliary volumes
(previously used in the IP partnerships) on respective sites.
- Add the change volumes to the respective relationships.
- Start the remote-copy relationships.
This procedure completes the migration of remote-copy relationships from native IP to Fibre
Channel.
Migrate the existing remote-copy relationships and partnerships from IPv4 to IPv6
deployments
To migrate from IPv4 to IPv6, the following requirements must be met:
This procedure applies to two
systems that are in IP
partnership over IPv4 on 7.2.0 or later code.
Complete the following procedure:
- Stop the relationships without the -access flag and verify that the status for
each relationship is in_sync.
- After all remote-copy relationships are stopped, stop the IP partnership on both systems.
- On system C1: #svctask chpartnership-stop <systemid C2>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership reports as
fully_configured_remote_stopped on system C2.
- On system C2 :#svctask chpartnership-stop <systemid C1>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership also reports as
fully_configured_stopped on system C2.
- Add the IPv6 IP addresses, which are configured on Datapath IP Ports (by using
cfgportip), in respective remote copy port groups.
- On system C1: #svctask cfgportip-node <node_id> -remotecopy_6
<portgrp_id_1_or_2> <port_no>
- On system C2: #svctask cfgportip-node <node_id> -remotecopy_6
<portgrp_id_1_or_2> <port_no>
Note: This step causes your remote-copy status to be listed as
unused from used since discovery for the
new paths on new IP addresses has not yet happened.
- Modify the IP partnerships to do discovery over IPv6 addresses.
- On system C1: #svctask chpartnership-type ipv6-clusterip <ipv6_ipaddr_of_cluster_c2>
<systemid C2>
- On system C2: #svctask chpartnership-type ipv6-clusterip <ipv6_ipaddr_of_cluster_c1>
<systemid C1>
- On system C1: #svctask chpartnership-start <systemid C2>
- On system C2: #svctask chpartnership-start <systemid C1>
Note: Since new data paths over
IPv6 addresses are now available, partnership will first change to
not_present, and then to fully_configured.
If it remains in not_present, monitor the node error/DMP if it is
getting triggered and check the appropriate DMP in the troubleshooting section.
- Start the remote-copy relationships.
This procedure completes the migration of remote-copy relationships from IPv4 to IPv6. This same
procedure can be applied when you migrate from IPv6 to IPv4 by applying suitable substitutes for
IPv4 instead of IPv6.
Migrate the existing remote-copy relationships and partnerships to new IP
addresses
When you change one or both system and datapath IP addresses of the system,
replication needs to be temporarily stopped during the procedure. However, host I/O can continue.
After the procedure is complete, the relationships need to resynchronize only the host write
operations that are submitted during the procedure.
This procedure applies to two systems that are in an IP partnership on
version 7.2.0 or later
code.
Complete the following procedure:
- Stop the IP partnership on both systems.
- On system C1: #svctask chpartnership-stop <systemid C2>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership reports as
fully_configured_remote_stopped on system C2.
- On system C2: #svctask chpartnership-stop <systemid C1>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership also reports as
fully_configured_stopped on system C2.
- Reconfigure the IP addresses on one or both systems by using the following
commands:
chsystemip-clusterip <new ip> -port
<ethernet port number>
cfgportip-node <node id> -ip
<new ip address> -netmask <new
netmask> -gw <new gateway>
- For each reconfigured system IP, reconfigure the partnership on the remote system:
If system
IP changed on system C1, then on system C2: #svctask chpartnership-clusterip <system IP of system C1>
<systemid C1>
If system IP changed on system C2, then on system C1:
#svctask chpartnership-clusterip <system IP of system C2>
<systemid C2>
- Restart the partnerships:
On system C1: #svctask chpartnership-start <systemid C2>
On system C2: #svctask
chpartnership-start <systemid C1>
- Restart any stopped relationships.
Migrate the existing remote-copy relationships and partnerships from 1 Gbps links to
10 Gbps links (vice versa)
Before you attempt to migrate existing deployments from 1 Gbps
links to 10 Gbps links, refer to the limitations and considerations requirements in the IP
partnership configuration topic.
Note: You cannot mix link speeds. For example, if there are two
links, both links should either be 10 Gbps links or both should be 1 Gbps links.
This procedure applies to two
systems that are in IP
partnership with each other over two 1 Gbps links on 7.2.0 or
later code.
Complete the following procedure:
- Stop the relationships without the -access flag and verify that the status for
each relationship is in_sync.
- After all remote-copy relationships are stopped, stop the IP partnership on both systems.
- On system C1: #svctask chpartnership-stop <systemid C2>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership reports as
fully_configured_remote_stopped on system C2.
- On system C2 :#svctask chpartnership-stop <systemid C1>
- The command lspartnership reports as
fully_configured_stopped on system C1.
- The command lspartnership also reports as
fully_configured_stopped on system C2.
- Add the IP addresses, which are configured on Datapath IP Ports (by using
cfgportip), on 10 Gbps links in respective remote copy port groups.
Note: This step causes your remote-copy status to be listed as
unused from used since discovery for the
new paths on new IP addresses has not yet happened.
- Start the IP partnerships.
- On system C1: #svctask chpartnership-start <systemid C2>
- On system C2: #svctask chpartnership-start <systemid C1>
Note: Since new data paths over
IPv6 addresses are now available, partnership will first change to
not_present, and then to fully_configured.
If it remains in not_present, monitor the node error/DMP if it is
getting triggered and check the appropriate DMP in the troubleshooting section.
- Start the remote-copy relationships.
This procedure completes the migration from 1 Gbps links to 10 Gbps links. This same
procedure can be applied to migrate from 10 Gbps to 1 Gbps by applying suitable substitutes for 1
Gbps ports instead of 10 Gbps ports.