When you install enclosures into a Network Equipment-Building
System (NEBS) compliant installation, each enclosure must have a reliable
electrical earth connection that is separate to any earth connections
provided by power supply cables.
On
Lenovo Storage V series enclosures, this connection is made by using the
front enclosure mounting screws that are part of the standard installation
described in
Installing support rails for Lenovo Storage V series systems and
Installing enclosures for Lenovo Storage V series systems. To provide a reliable electrical earth connection, the
upright mounting rails of the racks into which enclosures are installed
must meet the following requirements before installing the support
rails and enclosures:
- Upright mounting rails must not be painted, oxidized or otherwise
insulated from the enclosure flanges and mounting rails. If paint,
oxidization or other insulation is present, it must be removed and
the metal must be brought to a bright, non-corroding finish.
- Upright mounting rails must have their own NEBS-compliant connection
to earth, independent of the earth connections provided by any power
supply cables.