NEBS-compliant earth connection

When you install enclosures into a Network Equipment-Building System (NEBS) compliant installation, each enclosure must have a reliable electrical earth connection that is separate to any earth connections provided by power supply cables.

On Lenovo Storage V series enclosures, this connection is made by using the front enclosure mounting screws that are part of the standard installation described in Installing support rails for Lenovo Storage V series systems and Installing enclosures for Lenovo Storage V series systems. To provide a reliable electrical earth connection, the upright mounting rails of the racks into which enclosures are installed must meet the following requirements before installing the support rails and enclosures:
Notes:
  1. If the Lenovo Storage V series system is required to be NEBS-compliant, some system configuration settings must be made. For details, see Configuring a Lenovo Storage V series system to be NEBS-compliant.
  2. For more information about Lenovo Storage V series configuration guidelines and restrictions, see the following website: https://support.lenovo.com/us/en/solutions/ht505190
  3. If a Lenovo Storage V series system is clustered with a Lenovo Storage V series system, NEBS compliance cannot be enabled. NEBS compliance is not supported on Lenovo Storage V series systems.